Technical guide
Questions to ask before introducing AMRs
Autonomous mobile robots can take over repetitive internal transport, but only where the site, the task and the systems around them suit it. These are the questions to answer before committing.
What exactly will be moved?
Define the loads: pallets, roll cages, carts, totes or bins; their weight, dimensions and how they are picked up and set down. Mixed or irregular loads complicate the choice. Note whether loads must be lifted, towed or carried on top, and whether people currently use pallet trucks, forklifts or trolleys. A clear load list is the starting point for any robot selection.
Routes, distances and throughput
Map the moves: from where to where, how far, how often, and at what peaks. A simple from-to table with move counts per shift is more useful than a general statement. Consider whether moves are scheduled, triggered by a call from an operator or line, or requested by a warehouse or production system. Throughput needs decide fleet size and charging arrangements, so these numbers should come from site data rather than estimates.
AMR or AGV?
Automated guided vehicles traditionally follow fixed guidance such as magnetic tape, wires or markers, and stop when blocked. Autonomous mobile robots navigate using on-board sensors and a map, and can re-plan around obstacles. AMRs are usually more flexible when layouts change; AGVs can suit fixed, repetitive routes. The right choice depends on the layout, traffic and how often the process changes.
The site itself
Check floor condition: flatness, cracks, joints, slopes, ramps, dock plates and wet or dusty areas. Note doors, lifts, narrow aisles and pinch points. Mobile robots rely on wireless networks for fleet management, so Wi-Fi coverage along every route must be confirmed. Lighting, reflective surfaces and seasonal changes such as stacked goods in aisles can affect navigation.
People and safety
Robots will share space with people, forklifts and vehicles. A risk assessment by a qualified engineer is needed for the specific routes, speeds and loads, and safety design must follow applicable standards for industrial mobile robots and the site's own rules. Plan for marked routes, crossing points, signage and training. Involve the people who currently do the work early; their knowledge of the routes is valuable.
Integration and operation
Decide how robots will receive tasks: call buttons, a fleet-management interface, or integration with WMS, MES or PLC systems. Confirm what interfaces exist and who owns them. Plan charging locations and times, fault handling, who will maintain the fleet and how spares are supported.
Start small
A feasibility study followed by a pilot on one well-defined route is usually the lowest-risk path. Agree in advance what the pilot should demonstrate, how results will be measured and what happens next. This avoids committing to a fleet before the site and the process have proven ready.
Measuring success
Before the pilot starts, record how the work is done today: moves per shift, time per move, waiting times, damage incidents and the number of people involved. Agree which of these the pilot should change and by how much would count as worthwhile. Measuring the same things during the pilot gives an honest basis for deciding whether to scale up, adjust the routes or stop.
Checklist for your enquiry
Share what you know. Anything you are unsure of can be marked “not known” — our engineers will help confirm it.
- Application
- Load type
- Payload
- Load dimensions
- Routes and distances
- Moves per shift
- Cycle time
- Layout drawing
- Floor condition
- Doors and lifts
- Wifi coverage
- Traffic mix
- Interfaces
- Safety requirements
- Budget
Have a requirement?
Send what you know and an engineer will help with the rest.
Related products and solutions
Autonomous mobile robots (AMR)
Autonomous mobile robots (AMRs) that move materials around factories, warehouses and hospitals without fixed tracks or floor tape, navigating by laser mapping…
Automated guided vehicles (AGV)
Automated guided vehicles (AGVs) that carry, tow or lift loads along predefined routes in factories and warehouses, guided by magnetic tape, laser,…
Mobile-robot material transport
Mobile-robot systems for routine internal transport of parts, totes, carts, medicines and supplies between workstations, stores, wards and docks, planned route by…
Pallet and tow-cart movement automation
Automated movement of pallets and tow-carts using autonomous forklift stackers, pallet-carrying robots and tugger vehicles, for rack put-away and retrieval, dock transfers,…
Warehouse intralogistics integration
Integration of mobile robots and AGVs with warehouse and production systems, defining how tasks are created, handed over and confirmed between robots,…
AMR fleet-management integration
Fleet management for AMRs and AGVs, assigning tasks, managing routes, charging and shared resources, and exchanging status with warehouse, production and equipment…
Industrial robot deployment and commissioning
Deployment and commissioning of industrial robots, AMRs and AGVs, from site survey and design through installation, interface integration, safety validation, acceptance testing,…
AMR feasibility assessment
Feasibility assessment for autonomous mobile robots and AGVs, reviewing material flows, loads, routes, site conditions and system interfaces to decide whether mobile…
Robot navigation and route mapping
Navigation setup and route mapping for mobile robots, covering site mapping, route and zone definition, traffic rules, interactions with people, doors and…
Robotic fleet maintenance support
Maintenance and support for AMR and AGV fleets, including preventive maintenance, technical support, troubleshooting and updates, to keep mobile robots and their…
Conveyor and material-handling automation
Automation of conveyors and material-handling equipment, using drives, PLCs, sensors and operator controls to move goods safely and consistently through production, storage,…
Read next
Frequently asked questions
How long does an AMR feasibility assessment take?
It depends on the size of the site and how much data already exists, such as layouts and move counts. Share what you have and we will propose a scope. The aim is a clear view of whether automation is practical and what a pilot would involve.
Will robots work alongside forklifts and people?
Often they can, but it must be designed for. Routes, speeds, crossing points and safety functions need a risk assessment by a qualified engineer for your specific site, and staff need training. Some areas may be better segregated.